LEIGH BARRIER GAUGEBOARD INSTALLATION

LEIGH BARRIER GAUGEBOARD INSTALLATION – MARCH 2022 – RESERVOIR AND WATER SERVICES

NORTHERN GATE

northern gate GAUGEBOARD

Note red pointer between the two radial arms at the bottom of the gate.


CENTRAL GATE


SOUTHERN GATE

Note red pointer between the two radial arms at the bottom of the gate.


VERTICAL BOARD ON LEFT-HAND DOWNSTREAM TRAILING WALL


STAGGERED BOARDS (3 MORE TO INSTALL FROM 29m UP TO 32m)

STAGGERED BOARDS ALONGSIDE SLOPING ACCESS TRACK

Enter your keyword